PowerON – Durham Region Transit

Charging the Future of Public Transit “Installed critical EV charging infrastructure to support the transition to electric bus fleets—reducing emissions and enabling long-term transit electrification” By partnering with ACU this project involved the installation of civil and electrical infrastructure to support electric vehicle charging operations at an active facility, contributing to the transition toward lower-emission […]
TTC – Roncesvalles Carhouse Modifications

“Upgrading Infrastructure for Safer, Sustainable Transit” Supports reliable, low-emission transit by upgrading facilities for safe and efficient LFLRV servicing. The Roncesvalles Carhouse Track 21 High-Level Platform Modifications project involves upgrades to an existing TTC streetcar maintenance facility to improve the safety, accessibility, and operational functionality of the inspection platform used for servicing low-floor light rail […]
University of Windsor Welcome Centre

A Gateway to Campus, and a Step Toward Net-Zero. “Designed for future-forward performance, the Welcome Centre integrates energy-saving systems, smart climate control and low-carbon site strategies to reduce operational waste and support the University’s net-zero goals.” Integrated building automation, zoned HVAC with heat recovery, and energy-smart lighting systems significantly cut energy use and operational carbon […]
Hotel X

Reducing Energy, Water, and Carbon at Every Level “High-performance building systems and envelope design reduce energy use through heat recovery, smart controls, and demand-driven ventilation—supporting net-zero operational goals.” Integrated energy and water strategies, from heat recovery HVAC to low-flow systems, significantly reduce operational demand. The Hotel X Toronto project delivers a large-scale, mixed-use hospitality and […]
Woodbine Racetrack Redevelopment

Reimagining 684 Acres for a Low-Carbon Future “Energy-efficient systems, smart controls, and site-wide upgrades reduce energy use, water demand, and operational emissions, supporting Woodbine’s path to net-zero.” Upgraded HVAC, LED lighting, and building automation systems significantly improve operational efficiency The Woodbine Racetrack redevelopment transforms a major entertainment and racing facility into a high-performance, multi-purpose venue […]
Rutherford Go

Moving More People with Less Impact “LEED Gold-certified transit hub designed to reduce emissions through increased rail capacity, active transportation access, and energy-efficient systems.” Bioswales and permeable paving improve stormwater management and reduce environmental impact on surrounding infrastructure. The Rutherford GO Station redevelopment transforms a commuter rail station into a LEED Gold-certified, high-capacity transit hub […]
AGA Khan Museum

The Aga Khan Museum delivered a purpose‑built cultural institution for Muslim arts and heritage while integrating sustainability measures to support net‑zero objectives. The project combined a museum building, exhibition galleries, conservation and collections storage, a learning centre, auditorium, and public amenities within an Islamic‑inspired landscaped garden. Durable, high‑quality materials and craftsmanship were selected to extend […]